top of page
C&CCC

Update for first club TT event, this evening 16.07.20

I am pleased to confirm that as from 10.30 am today (16.07.20), Western Power have cleared their operating traffic lights etc. from the carriageway and there are no current roadworks.

Please note that there are road diversion signs further up the B4077 towards Toddington (and close to our sign on location at Orchard Industrial Estate), so please ignore these signs, as the actual road closed is up Stanway Hill, which is not part of our course.

Please also note, that the road surface around the Toddington roundabout is uneven and is just a tarmac base course, so please be careful going around this roundabout to return down the B4077.  I have spoken with the highway authority and they plan resurfacing around this roundabout after 19.00 hrs on 21.07.20, so hopefully not affecting our next planned TT event on the 23.07.20!

Fingers crossed we can now run our first TT event, this evening.

Gary Rickards

TT Captain

2 views0 comments

Recent Posts

See All

コメント


bottom of page